皇冠网址
热门标签

皇冠体育官网开户(www.hg108.vip):Fukushima debris removal delayed by another year

时间:4周前   阅读:4   评论:1

皇冠体育官网开户www.hg108.vip)是一个开放皇冠体育官网即时比分、皇冠体育官网开户的平台。皇冠体育官网开户平台(www.hg108.vip)提供最新皇冠体育官网登录,皇冠体育官网APP下载包含新皇冠体育官网代理、会员APP。

Rafael Grossi (2nd right), director-general of the International Atomic Energy Agency, inspects the Fukushima Daiichi nuclear power plant’s decommissioning process at Okuma, Fukushima Prefecture, Japan, on May 19. – EPA pic, August 26, 2022.

WORK to remove nuclear debris from the devastated Fukushima power station in Japan has been delayed again to ensure the safety of the multi-decade project, plant operator Tepco said.

,

新2最新网址www.hg108.vip)实时更新发布最新最快最有效的新2网址和新2最新网址,包括新2手机网址,新2备用网址,皇冠最新网址,新2足球网址,新2网址大全。

,

Tokyo Electric Power Co (Tepco) had planned to begin extracting radioactive debris from one of the reactors this year – already later than the original 2021 start date.


转载说明:本文转载自Sunbet。

上一篇:足球免费推荐(www.ad168.vip):谈一下湖人为什么一定要交易威少

下一篇:环球国际娱乐网址多少:第3位!阿尔瓦雷斯已罢训,告知阿贾克斯想去切尔西+拿高薪

猜你喜欢

网友评论